Wednesday, November 28, 2007

Trench that will carry water from the well to the house as well as power to the barn.

Electric, cable and phone trench.


Under ground utility conduit from the pole.
Posted by Picasa

Tuesday, November 27, 2007

The gas fireplace is delivered and installed.

Looks like a rumford!

Windows begin to go in in the living room.

View from street with front windows in.
Posted by Picasa

Monday, November 19, 2007

Another view of the screened porch with the french door opening from the living room.

View from the road is taking shape.
Posted by Picasa
Work continues on the screened porch.

The mahogany porch floor...a work in progress.

Shingles begin to appear on the west facing roof.
Posted by Picasa

Wednesday, November 14, 2007

Work continues on the screened porch today.

Gable end trim up on master BR
Posted by Picasa
The drilling rig

The well-head
Posted by Picasa
The crew (L-R) Shawn, Charlie, Mike, Steve (aka Charlie Manson) and John

Capitol Well after going down 200 feet and getting 6 gallons per minute....we were hoping for sweet light crude but water will have to do.

Back deck taking shape
Posted by Picasa

Friday, November 2, 2007

View from above before Tropical storm Noel arrives tomorrow.
Posted by Picasa
View from 1000 feet up.

Housewrapped in green.

Wrap on the back with ice and water shield applied.
Posted by Picasa

Thursday, November 1, 2007

Roof sheathing about completed and chimney form is built
Posted by Picasa